Mold Making Service

The mold determines the cost, quality and lifespan of every molded part. We design and build injection molds in our own tool shop — rapid tooling to validate your design quickly, and hardened production tooling engineered for high-volume programs.

By Molding Process

Tooling designed around the molding process your part needs.

  • Standard two-plate molds
  • Three-plate molds
  • Two-shot / multi-shot molds
  • Insert & overmold tooling

By Production Volume

Rapid tooling for validation, production tooling for long runs.

  • Rapid tooling — weeks, not months
  • Bridge tooling for early production
  • Hardened production tooling
  • Multi-cavity & family molds

By Precision

Precision molds for tight-tolerance and cosmetic-grade parts.

  • Precision mold making
  • Tight tolerance control
  • Textured / cosmetic surfaces
  • Hot runner systems

How a Mold Is Made: 8 Stages from DFM to Trial Shots

Our tool shop runs the full cycle in-house — DFM, design, machining, assembly and trial. Stage sequence mirrors the 12-step public workflow at https://firstmold.com/mold-making-service/.

1

DFM & Mold Design

Part geometry review, gate and runner layout, cooling-circuit design and mold-flow analysis before any steel is cut. DFM is the cheapest revision you will ever make.

2

Materials Preparation

Mold steel ordered and verified per program class — P20/718 pre-hardened for standard production, H13 or S7 for high-pressure or die-casting work.

3

CNC Machining

3-axis and 5-axis CNC milling of cores, cavities and inserts in our tool shop; 5-axis cuts deep, angled features that 3-axis would need multiple setups for.

4

Sinker EDM Machining

Sinker EDM burns sharp internal corners, square pockets and deep ribs that no cutter can reach; electrodes are machined in-house for tight control.

5

Wire-Cut EDM

Wire EDM cuts through-hardened inserts, core pins and ejector profiles — 9+4 wire-cut machines on our floor.

6

Assembly & Fitting

Mold-base assembly, core fitting, clearance and alignment checks — the stage where fit-up errors show up before any plastic is shot.

7

Polishing & Surface Finish

Cavity polishing to SPI grades A1–D3 and texturing or etching for cosmetic surfaces, finished to your surface spec.

8

Trial & Approval

Trial shots on our Sodick presses, dimensional verification and approval samples before the mold is released to production.

Mold Types We Build, by Process and Volume

Classification follows https://firstmold.com/mold-making-service/ (by molding process, production volume and precision).

Two-plate injection molds — the workhorse; simple parting, low cost, fast cyclesThree-plate injection molds — separate runner plate for multi-drop gatingHot-runner molds — no cold-runner scrap; critical for engineering resinsTwo-shot / multi-shot molds — two materials in one cycleInsert & overmold tooling — metal inserts or TPE over a molded substrateRapid (aluminum) tooling — 100–10,000 cycles for validation and bridge runsHardened production tooling — 100k–1M+ cycles for mass productionDie-casting molds — H13-based tooling for aluminum and zinc parts

Mold Steel Selection Guide

Hardness values are public supplier data; P20/718/H13 guidance per the FAQ at https://firstmold.com/mold-making-service/. MOLDITQUICK keeps all listed grades in stock for in-house tooling.

SteelHardness (HRC)StrengthsBest ForTypical Life
P2028–32Pre-hardened, easy machining and polishing, low costMedium and small molds, general-precision parts200k–500k shots
718 (1.2738)28–33Nickel-added — better toughness and hardenabilityLarge, complex, precise injection molds500k–1M shots
NAK8038–42Mirror-polish capability, no heat-treatment distortionCosmetic, optical and high-gloss surfaces500k+ shots
S136 (1.2083)48–52Corrosion-resistant, high hardnessMedical, food-contact and transparent parts1M+ shots
H1344–52Hot-work toughness, thermal-fatigue resistanceDie-casting molds and high-temperature plastics500k–1M shots
S756–60Impact- and shock-resistantHigh-pressure thin-wall and abrasive resins1M+ shots

SPI Mold Classification — Class 101 to 105

SPI / Plastics Industry Association class system; firstmold.com/mold-making-service/ states strict adherence to SPI mold classification standards.

ClassCycle LifeMold SteelTypical Program
1011,000,000+Hardened tool steel (H13, S7)High-volume automotive and medical; 5+ year life
102500,000–1,000,000Hardened steelLong-running appliance and power-tool programs
103300,000–500,000P20 / 718 pre-hardenedStandard consumer-goods production
104~100,000P20 or aluminumBridge tooling, pilot programs, spares
105< 500Aluminum / soft toolingPrototype validation and design iteration

EDM, Wire-Cut and CNC: The Machining Core of Mold Making

EDM, wire-cut and CNC are the three dominant material-removal operations, in the sequence of the 12-step workflow at https://firstmold.com/mold-making-service/. MOLDITQUICK runs these in-house on a 10,000 m² floor with 280 staff.

1

CNC Milling

Rough and finish 3D cavity geometry; 5-axis machines handle deep ribs and angled features in one setup, holding ±0.01 mm on mold inserts.

2

Sinker EDM

Burns sharp internal corners, square pockets and narrow ribs (radius below R0.3) that cutters cannot reach; electrodes machined in-house.

3

Wire EDM

Through-cuts precision inserts, core pins, ejector and runner profiles in hardened steel without distortion — 9+4 wire-cut machines in-house.

4

Surface Grinding

Holds flatness and parallelism on parting surfaces and mold plates before assembly.

5

Polishing & Texturing

SPI A1–D3 polish grades and chemical etching for leather, grain and texture finishes on cosmetic cavities.

Mold Lead Time and Cost: What the Numbers Really Are

Cycle and cost-share figures are public values from the FAQ at https://firstmold.com/mold-making-service/; MOLDITQUICK program lead times are our own standard commitments.

Simple / small mold1–2 weeks from approved DFM
Medium-complexity mold2–4 weeks
Complex or large mold8+ weeks (large tools can run 3+ months)
Rapid toolingFrom 7 days on urgent programs
Mold steel share of total cost≈20–30% (simple molds near 20%, complex molds above 30%)
MOLDITQUICK low-volume programFirst molded parts in 7–12 days
MOLDITQUICK mass-production programTooling plus first production in 25–30 days
Quality systemIATF 16949, ISO 13485 and ISO 9001 controlled tool shop

Mold Making FAQ

Answers follow the public FAQ at https://firstmold.com/mold-making-service/.

Five Mold-Sourcing Failures and How We Prevent Them

Failure modes published at https://firstmold.com/mold-making-service/ (molding defects, hidden cost, repeated trials, late delivery) and the engineering countermeasures we apply.

Molding defects

Too many defects — burn marks, flow lines, sink marks, short shots, flash — during the whole mold life.

Defect prevention

Mold-flow analysis before steel is cut plus a trial-verified process window per cavity.

Hidden cost

Long injection cycles, rework and untimely communication quietly inflate the program cost.

Cost control

DFM-locked design, documented cycle-time targets and a named project manager on every tool.

Repeated trials

The mold is repaired again and again because of design or process problems, delaying the schedule.

One-trial approval

Design checklist plus manufacturing review before machining — most molds reach approval in one trial round.

Late delivery

Delivery pushed back several times with endless excuses.

On-time delivery

Schedule-controlled tooling cycle with weekly progress reports and mold photos — 7–12 day low-volume programs.